McCULLY DRAFTING Request a quote

How a job runs

What I need from you, what you get back, and how long it takes.

Start to finish

Who has the job at each step.

  1. Documents inYou send the bid documents and your proposal.With me
  2. Quote outI send a price based on the sheet count.With you
  3. Go-aheadI start drawing.With me, 2 to 3 weeks
  4. Set issuedYou get a PDF set, ready to submit.With the architect
  5. Comments backYou send me the architect’s comments.With me
  6. Set reissuedI send the revised set.

Quote

Send me what you bid from. I count the openings, figure how many sheets it will take, and quote from that.

Architectural drawings

Plans, elevations and details.

Spec sections

08 41 13 storefront, 08 44 13 curtain wall, 08 80 00 glazing, and 08 71 00 door hardware if it applies.

Your proposal

Or your scope letter, so I know what you’re supplying.

Request a quote

Drawings

Once you give the go-ahead, I draw the floor plan, elevations and details in AutoCAD.

Turnaround
Usually 2 to 3 weeks from the go-ahead
Rush
Faster for a rush fee. Tell me the date you need when you ask for the quote.
You get
A PDF set on 24 × 36 sheets, ready to submit
What’s in a set

Review

Send me the architect’s comments when they come back. I revise the sheets and reissue the set.

Whose changeWhat it costs

My mistake

Free

A change from you or the GC

Billed by the sheet

Send me the bid documents and your proposal, and I’ll get you a quote.